2x4 or 2x6 construction Nashville TN

Part of our remodeling project included installing an artificial putting green in the backyard.

Local Companies

Capital Leasing & Finance Inc
(615) 292-4466
2716 Westwood Dr
Nashville, TN
Thompson Machinery Commerce Corporation
(615) 744-7800
Nashville, TN
Premier Rental Purchase
(615) 782-7201
2638 Nolensville Pike
Nashville, TN
Home Depot the
(615) 662-4400
7665 Highway 70 S
Nashville, TN
Advance Leasing
(615) 871-9441
Nashville, TN
Scott Carleen Equipment Leasing Services
(615) 399-9183
Nashville, TN
Rainbow Rentals
(615) 356-4100
5815 Charlotte Pike
Nashville, TN
Rent-A-Center
(615) 367-9221
1128 Murfreesboro Pike
Nashville, TN
Tennessee Rentals Llc
(615) 889-8845
209 River Hills Dr
Nashville, TN
Home Depot the
(615) 860-1651
1584 Gallatin Ave
Nashville, TN

Why do people choose to use 2x6 construction over 2x4? Well, in most areas 2x4 construction is sufficient. 2x4 construction will easily support a home's structure and weight. The main reason 2x6 construction is attractive is for the extra insulating value. However, with the blown-in-insulation available today, most homes can pass the Mec-Check, (Model Energy Code) with 2x4 construction. Most of the heat loss occurs through windows and doors, as well as the attic. If you were concerned about conserving energy, I would recommend putting more insulation in your attic and upgrade your south and western facing windows to a low-E- type window. My opinion of why people choose 2x6 construction is based more on fear than on fact. Lumber companies and insulation companies have pushed the 2x6 construction because they make more money. Realtors have bought into the 2x6 hype because it gives the home a slight selling advantage.

There are certainly some advantages of building with 2x6 construction, but there are disadvantages also. The cost of 2x4x8' studs is 40% less than a 2x6x8' studs. On top of that, there are the bottom and the two top plates. Then there is the added cost for the extra insulation, as well as, deeper windowsills.

Another thing to consider is house plans are measured from outside to outside of walls. Therefore, room sizes will be two inches less. A 2400 sq foot home plan would actually be 33 square feet less on the interior. With homes costing about 100 a square foot, that is $3,300 .

The bottom line is 2x6 construction costs more and gives you less house. However, some think it is worth the sacrifice. I build homes with both, but I kind of think it is a waste of resources and money to use 2x6 construction. I don’t care what you choose, but I want you to know why you choose it.

For more information, go to www.theplancollection.com.

Featured Local Company

Thompson Machinery

(931) 552-5496
541 Alfred Thun Rd
Clarksville, TN
http://www.thompsonmachinery.com