2x4 or 2x6 construction Seattle WA

Part of our remodeling project included installing an artificial putting green in the backyard.

Local Companies

R & R Rentals
(425) 822-4001
10920 Northup Way
Bellevue, WA
Pacific Rim Concrete Pump Inc
(425) 453-8140
3237 110th Ave SE
Bellevue, WA
Eastside Staple & Nail Inc
(425) 641-6191
1917 120th Ave NE
Bellevue, WA
Baldwin and Sons Power Equipment
(425) 453-7673
12700 Bel Red Rd
Bellevue, WA
Dolsen Leasing Company
(425) 454-4002
1940 124th Ave NE
Bellevue, WA
R & R Party Rentals
(425) 688-0099
1923 120th Ave NE
Bellevue, WA
Star Rentals
(425) 885-5522
12900 Northup Way
Bellevue, WA
Aronson Campbell Industrial Supply Inc
(425) 372-2000
1700 136th Pl NE
Bellevue, WA
Grainger Industrial Supply
(425) 643-7754
2221 120th Ave NE
Bellevue, WA
Hydraulic Components
(425) 644-6980
13406 SE 32nd St
Bellevue, WA

Why do people choose to use 2x6 construction over 2x4? Well, in most areas 2x4 construction is sufficient. 2x4 construction will easily support a home's structure and weight. The main reason 2x6 construction is attractive is for the extra insulating value. However, with the blown-in-insulation available today, most homes can pass the Mec-Check, (Model Energy Code) with 2x4 construction. Most of the heat loss occurs through windows and doors, as well as the attic. If you were concerned about conserving energy, I would recommend putting more insulation in your attic and upgrade your south and western facing windows to a low-E- type window. My opinion of why people choose 2x6 construction is based more on fear than on fact. Lumber companies and insulation companies have pushed the 2x6 construction because they make more money. Realtors have bought into the 2x6 hype because it gives the home a slight selling advantage.

There are certainly some advantages of building with 2x6 construction, but there are disadvantages also. The cost of 2x4x8' studs is 40% less than a 2x6x8' studs. On top of that, there are the bottom and the two top plates. Then there is the added cost for the extra insulation, as well as, deeper windowsills.

Another thing to consider is house plans are measured from outside to outside of walls. Therefore, room sizes will be two inches less. A 2400 sq foot home plan would actually be 33 square feet less on the interior. With homes costing about 100 a square foot, that is $3,300 .

The bottom line is 2x6 construction costs more and gives you less house. However, some think it is worth the sacrifice. I build homes with both, but I kind of think it is a waste of resources and money to use 2x6 construction. I don’t care what you choose, but I want you to know why you choose it.

For more information, go to www.theplancollection.com.

Featured Local Company

R & R Rentals

(425) 822-4001
10920 Northup Way
Bellevue, WA
http://www.rr-rentals.com