A change in season doesn't need to affect your finish Austin TX

High viscosity "coatings" act like cold honey; therefore, the lacquer will not "atomize" into small particles and flow out to a level smooth surface before it dries.

Local Companies

Austin Plumbing and Heating Services and Repair
512-687-8910
815 Brazos St.
Austin, TX
hernandez drywall
512 367 3048 ) 512 736 1276
1601 montopolis dr # 626
austin, TX
Under Budget Cabinets
512-836-7283
2600 Longhorn Blvd, Suite #104
Austin, TX
Halcyon Environmental
281-705-4579
4605 San Simeon
Austin, TX
David J. Potter
512.251.3982
3904 Lemos Drive
Austin, TX
Amado Guerrero & Company The Re Modeling Group
512 902 8642
5612 alomr cove
del valle, TX
Miner's Hardwood Floors
(512)351-1424
1610 Southcreek Dr
Leander, TX
White Wind Woodworking
(512) 389-0099
777 Shady Ln
Austin, TX
Technowood Inc
(512) 692-4565
2012 Centimeter Cir
Austin, TX
Tinker McCann
(512) 302-0774
707 W Saint Johns Ave
Austin, TX

provided by: 

Q: We have a small cabinet shop in the Northeastern part of the United States. Every fall my finisher has problems with our precatalyzed lacquer. It will not "flow" out smooth before it dries. It feels rough to the touch, and customers have been complaining about our finish. What has he been doing wrong?

P.S. He has been making the finish "run" and "sag" a lot lately.

A: Generally, this problem relates to cold material temperatures. It is possible that you may be experiencing night time temperatures between 40 to 50 F this time of year, since you are located in the far Northeast. Many shops do not leave the heat turned up at nighttime or store their coating material in a location where the coating material temperatures can easily drop to 60 F or less. A 10-degree drop from 72 F will increase your coating's viscosity up to as much as 30 percent.

High viscosity "coatings" act like cold honey; therefore, the lacquer will not "atomize" into small particles and flow out to a level smooth surface before it dries. Other problems can cause this defect; however, this roughness or "orange peel" effect — plus experiencing problems with runs and sags — indicate that this issue is related to cold material temperatures.

You could try bringing the coating material temperature up by placing the pails of coating in a safe heated area the night before use. This should solve your problem. It is always important to ensure finishing materials are above 72 F before using.

Ed. note: Phil Stevenson is the founder of the American Wood Finishing Institute (AWFI) in Vineland, N.J.

author: By Phil Stevenson


Featured Local Company

Austin Plumbing and Heating Services and Repair

512-687-8910
815 Brazos St.
Austin, TX

Related Local Events
Central Texas Construction Expo 2009
Dates: 6/30/2009 - 7/1/2009
Location: Palmer Events Center
Austin, TX
View Details

Construction Expo-Austin
Dates: 6/30/2009 - 7/1/2009
Location: Palmer Events Center
Austin, TX
View Details