A change in season doesn't need to affect your finish Oakland CA

High viscosity "coatings" act like cold honey; therefore, the lacquer will not "atomize" into small particles and flow out to a level smooth surface before it dries.

Local Companies

A1 Sun Inc
510.526.5715
Berkeley, CA
Walters & Wolf
(510) 490-1115
653 Harrison St.
San Francisco, CA
Superiorbath
510-265-0566
28302 Industrial Blvd., Ste E
Hayward, CA
Brinks Home Security
707-695-8566
5036 Commercial Circle, Ste A
Concord, CA
Dome Lighting & Fan Compay
925 -685-2712
1150 Concord ave.
concord, CA
Allied Wood Products
(510) 536-1277
2908 E 7th St
Oakland, CA
Design Workshops
(510) 434-0727
Oakland, CA
Pacassa Studios
(510) 465-4655
1793 12th St
Oakland, CA
Lazercut
(510) 534-9663
2934 Ford Unit St # 11
Oakland, CA
Open Hand Manufacturing Inc
(510) 532-1843
1033 44th Ave
Oakland, CA

provided by: 

Q: We have a small cabinet shop in the Northeastern part of the United States. Every fall my finisher has problems with our precatalyzed lacquer. It will not "flow" out smooth before it dries. It feels rough to the touch, and customers have been complaining about our finish. What has he been doing wrong?

P.S. He has been making the finish "run" and "sag" a lot lately.

A: Generally, this problem relates to cold material temperatures. It is possible that you may be experiencing night time temperatures between 40 to 50 F this time of year, since you are located in the far Northeast. Many shops do not leave the heat turned up at nighttime or store their coating material in a location where the coating material temperatures can easily drop to 60 F or less. A 10-degree drop from 72 F will increase your coating's viscosity up to as much as 30 percent.

High viscosity "coatings" act like cold honey; therefore, the lacquer will not "atomize" into small particles and flow out to a level smooth surface before it dries. Other problems can cause this defect; however, this roughness or "orange peel" effect — plus experiencing problems with runs and sags — indicate that this issue is related to cold material temperatures.

You could try bringing the coating material temperature up by placing the pails of coating in a safe heated area the night before use. This should solve your problem. It is always important to ensure finishing materials are above 72 F before using.

Ed. note: Phil Stevenson is the founder of the American Wood Finishing Institute (AWFI) in Vineland, N.J.

author: By Phil Stevenson


Featured Local Company

A1 Sun Inc

510.526.5715
Berkeley, CA
www.a1suninc.com

Related Local Events
ASCE - ATC & SEI Conference on Improving the Seismic Performance of Existing Buildings and Other Structures
Dates: 12/9/2009 - 12/11/2009
Location: Hyatt Regency San Francisco
San Francisco, CA
View Details

San Francisco Spring Home Show
Dates: 1/15/2010 - 1/17/2010
Location: Cow Palace
San Francisco, CA
View Details

San Jose Spring Home Show
Dates: 3/12/2010 - 3/14/2010
Location: San Jose McEnery Convention Center
San Jose, CA
View Details

PCBC - Pacific Coast Builders Conference 2010
Dates: 6/9/2010 - 6/11/2010
Location: Moscone Center
San Francisco, CA
View Details

San Jose Fall Home Show
Dates: 10/30/2009 - 11/1/2009
Location: San Jose McEnery Convention Center
San Jose, CA
View Details