A guide to green demolition Miami FL

Recycling service that helps eco-friendly development. Read to learn more about being friendly on your environment.

Local Companies

Ross & Baruzzini
(305) 477-8338
7205 NW 19th Street
Miami, FL
CDC Builders Inc
(305) 263-5198
5805 Blue Lagoon Dr
Miami, FL
Heery International, Inc.
(305) 441-1556
811 Ponce De Leon Blvd
Coral Gables, FL
Concrete.www.miamiartisticconcrete.com
305-224-2358
2081 sw 81 av
miami, FL
GREENLIGHT CONSTRUCTION
954-410-9331
7172 SW 47 STREET
MIAMI, FL
Lemartec Engineering & Construction Corp
(305) 661-9393
4800 SW 74th Ct
Miami, FL
Lemartec Engineering & Construction Corp
(305) 661-9393
4800- SW 74th Ct
Miami, FL
A & A Painting Services LLC
(786) 366 9486
211 NW 19 Ave
Miami, FL
Green Cay Village Homes
736-1440
3250 Mary St., #500
Coconut Grove, FL
3 C Construction
(305) 638-5511
3601 Nw 55th St
Miami, FL

  

provided by: California Builder and Engineer

Edited by Loren Faulkner

Although green design and construction has been much talked about the past few years, one part of green building is not mentioned as often: green methods used during the demolition phase of a construction project. Many U.S. cities require ? or strongly encourage ? contractors to minimize the amount of construction and demolition material being sent to the landfill.

In response to state regulations, many communities are using ordinances requiring construction firms to submit recycling plans for their construction projects and to report the amount of materials disposed of and recycled.

In San Diego, for example, the city council recently approved an ordinance designed to improve recycling use. The ordinance makes it mandatory for each qualifying site to divert at least 50 percent of its waste to a recycling center.

By providing contractors with recycling programs and access to facilities, recycling and waste removal companies around the nation have made it easier for contractors to dispose of their waste responsibly. When recycling facilities increase, so will the mandatory recycling rates. Companies offering recycling and waste collection services usually are aware of the state regulations and can help contractors and property owners meet their "green demo" goals.

Defining "Clean" (Recyclable) Construction Waste

When potentially recyclable waste materials are separated from "contaminating" debris, the recyclable material is considered clean. For example, contractors that extract fluorescent light fixtures from an existing building typically have them processed in order to separate the potentially hazardous waste ? the florescent bulbs and ballast ? from recyclable materials, plastics and metal. Although the process of light bulb recycling is relatively expensive (approximately $6 per fixture) due to the required processing and hazardous material disposal fees, it is a vital step in proper green demolition.

After extracting the clean material from the job site, the remaining mixed waste material (construction waste collected together with debris and/or contaminants) is either transported to a landfill, or is taken to a waste transfer facility to be sorted.

Green Demo Saves Green

Along with environmental benefits, recycling construction and demolition waste can have potential cost savings. Usually, waste hauled to a landfill requires expensive "tip" fees to cover the cost of burying the material with municipal trash. But facility-use fees at recycling sites are less than half that of landfill rates, and cover the cost of processing the material into saleable materials, such as aggregate or compost, making it a win-win for both the contractor and the environment.

Earning LEED Points for Green Demolition

Another benefit of green demolition is that it's a fairly inexpensive and effortless way for property owners and developers to earn coveted LEED points. Following are the requirements for LEED demolition points based on the Commercial Interiors v2.0 ? MR (Materials & Resources) Section; Construction Waste Management:

Credit 2.1 and 2.2 involve diverting construction, demolition and land clearing debris from landfills. These credits represent meaningful criteria towards a project's LEED certification, since both credits are worth one point each. Credit 2.1 is achieved when 50 percent of the construction, demolition and packaging materials is salvaged and/or recycled. Credit 2.2 is achieved when 75 percent of the construction, demolition and packaging materials is salvaged and/or recycled. Note that the point for Credit 2.2 is in addition to the point obtained for Credit 2.1.

What Types of Construction Materials Can You Recycle?

  • Concrete
  • Asphalt
  • Dirt and rock
  • Wood waste
  • Metal, including metal siding, pipe, storage sheds, old appliances, etc.
  • Landscape waste, including tree limbs, brush, ivy, Christmas trees, etc.
  • Carpet (through the manufacturer)

Patrick Willette is a project manager and LEED Accredited Professional for Johnson & Jennings General Contracting, in San Diego, California. www.johnsonandjennings.com.



author: By Patrick Willette

California Builder and Engineer. Copyright © 2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.

Featured Local Company

Ross & Baruzzini

(305) 477-8338
7205 NW 19th Street
Miami, FL

Related Local Events
Miami (Spring) Home Design & Remodeling Show
Dates: 3/26/2010 - 3/29/2010
Location: Miami Beach Convention Center
Miami Beach, FL
View Details

IDEA - International Engineered Fabrics Conference & Expo
Dates: 4/27/2010 - 4/29/2010
Location: Miami Beach Convention Center
Miami Beach, FL
View Details

Ft.Lauderdale Home Design & Remodeling Show
Dates: 6/4/2010 - 6/6/2010
Location: Broward County Convention Center
Fort Lauderdale, FL
View Details

Annual Convention and Southeastern Trade Show
Dates: 7/14/2010 - 7/17/2010
Location: Marriott Doral Resort
Miami, FL
View Details

Miami Home Design & Remodeling
Dates: 9/3/2010 - 9/7/2010
Location: Miami Beach Convention Center
Miami Beach, FL
View Details