Attaching Deck Ledgers Albany NY

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

ACE Line Striping
518-785-0096
PO Box
East Greenbush, NY
Residential One, LLC
518-383-3199
207 Riverview Road
Rexford, NY
Aquaseal USA
(866)788-9283
117 Vosburgh Road
mechanicville, NY
Heery International Inc
(518) 435-0603
125 Wolf Rd
Albany, NY
Gilbane
(518) 427-9697
16 Corporate Woods Blvd
Albany, NY
Tishman Construction Corp
(518) 463-1315
54 State St
Albany, NY
Turner Construction
(518) 432-0277
54 State St Ste 400
Albany, NY
British American Development Corp
(518) 436-9138
100 Broadway
Albany, NY
Gilbane
(518) 472-4801
16 Corporate Woods Blvd
Albany, NY
Sano-Rubin Constr
(518) 432-2764
45 Delaware Ave
Albany, NY


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

ACE Line Striping

518-785-0096
PO Box
East Greenbush, NY

Related Local Events
The Capital Region Fall Home Show
Dates: 10/23/2009 - 10/25/2009
Location: SportsPlex of Halfmoon
Clifton Park, NY
View Details

Mid-Atlantic Association of Museums Annual Conference and Expo
Dates: 10/18/2009 - 10/21/2009
Location: Gideon Putnam Resort and Spa
Saratoga Springs, NY
View Details

Rough & Ready Fire Engine Co. #2 Museum
Dates: 9/26/2009 - 9/26/2009
Location:
Greenwich, NY
View Details

NYS DOT Information and Updates to I-87 Construction
Dates: 9/22/2009 - 9/22/2009
Location: Albany-Colonie Regional Chamber of Commerce
Albany, NY
View Details

Harvesting Day at Fair Farm Museum
Dates: 9/12/2009 - 9/12/2009
Location: Washington County Fair Farm Museum
Saratoga Springs, NY
View Details