Attaching Deck Ledgers Baltimore MD

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

American Material Handling Equipment LLC
410-404-2268
508 S 46th, St
Baltimore, MD
T & R Trim and Cabinets
443-909-6377
6 Burnt Oak Road
Baltimore, MD
Basement Services 911
410-663-9111
3126 E Joppa Rd
Parkville, MD
CMD REMODELING AND CONSTRUCTION
410-322-3809
6710 GARY AVE
BALTIMORE, MD
eagle drywall & painting
(443) 955-2981
111111111111
dundalk, MD
master construction co.
4432044278
9500 perryhall blvd
baltimore, MD
Elite Decks & Outdoor Living
410-247-2701
1810 Selma Ave.
Elkridge, MD
Maryland Deck Builders, LLC
301-792-2518
361 Gaylor Rd
Glen burnie, MD
A Year Round Tree Expert Company
410-335-8675
5423 E. Joppa Rd
Perry Hall, MD
anderson home improvements, llc
(443) 974-6173
2409 sunset farm rd
ellicott city, MD


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

American Material Handling Equipment LLC

410-404-2268
508 S 46th, St
Baltimore, MD

Related Local Events
Baltimore County Chapter Board Meeting
Dates: 12/2/2009 - 12/2/2009
Location:
Towson, MD
View Details

HBAM Executive Committee Meeting
Dates: 12/9/2009 - 12/9/2009
Location: HBAM Conference Center
Baltimore, MD
View Details

Howard County Chapter Board Meeting
Dates: 12/17/2009 - 12/17/2009
Location:
Ellicott City, MD
View Details

Carroll County Chapter Board Meeting
Dates: 12/21/2009 - 12/21/2009
Location:
Westminster, MD
View Details

Suburban Maryland Spring Home Show
Dates: 2/5/2010 - 2/7/2010
Location: The Show Place Arena
Upper Marlboro, MD
View Details