Attaching Deck Ledgers Boulder CO

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

BEITEL, KEN
4410 Ludlow St
Boulder, CO
Fisher's Concrete Company
(720) 890-4202
1307 Courtesy Road, Unit C
Louisville, CO
Composite Technology Development, Inc.
(303) 664-0394
2600 Campus Drive, Ste. D
Lafayette, CO
Rocky Mountain Roof Doctors
(720) 887-1265
256 Greenway Circle W.
Broomfield, CO
CEC SERVICES USA
3030-404-9709
11157 CHASE WAY
WESTMINSTER, CO
Handyman Services
(303) 437 1062
12444 Arlilngton Ave
Broomfield, CO
Frank's landscape & concrete
303-709-0892
712 Drift Pl.
Longmont, CO
bob sandoval concrete contractor
303-271-3474
9975 wadsworth pkwy unitk2 #230
westminster, CO
Custom Woodworks Inc
303 828 1440
1020 Carbon Court
Erie, CO
USA MASONRY
720350-5000
15000 W. 44th Ave
Golden, CO


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

BEITEL, KEN

4410 Ludlow St
Boulder, CO

Related Local Events
Red Carpet Reception featuring Bennett Construction Company
Dates: 10/22/2009 - 10/22/2009
Location: Fort Collins CO Chamber of Commerce
Fort Collins, CO
View Details

Multi Housing World
Dates: 10/1/2009 - 10/2/2009
Location: Colorado Convention Center, Denver
Denver, CO
View Details

MULTI-HOUSING WORLD CONFERENCE & EXPO
Dates: 10/1/2009 - 10/3/2009
Location: Colorado Convention Center
Denver, CO
View Details

PHOTOVOLTAICS BEYOND CONVENTIONAL SILICON - USA
Dates: 9/15/2009 - 9/17/2009
Location: Hyatt Convention Center Hotel
Denver, CO
View Details

Business of the Month featuring Sears Trostel Lumber & Hardwoods
Dates: 8/18/2009 - 8/18/2009
Location: Sears Trostel Lumber & Hardwoods
Fort Collins, CO
View Details