Attaching Deck Ledgers Columbus OH

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

L & S Drywall And Flooring
614-376-8583
2222 Gerbert Road
Columbus, OH
Energy Efficient Lighting Supply
614 784-1304
1741 Cleveland Ave
Columbus, OH
Columbus Spec Homes
614-621-5404
439 East Mound St.
Columbus, AK
Jendco Safety Supply Inc.
(614) 449-9600
1616 Integrity Drive East
Columbus, OH
ALL AROUND HAULING
614-870-7447
469 COLUMBIAN AVE
COLUMBUS, OH
Pegs Paving Inc.
(614)836-1606
4997 Hendron Rd.
Groveport, OH
Crack Killer
1-866-665-2501
124 Prestfield Circle
Pickerington, OH
G T S A Construction Consulting
(614) 443-9999
730 Mohawk St
Columbus, OH
Bovis Construction Corp
(614) 621-4148
111 W Rich St
Columbus, OH
Kolbe Construction Services Inc
(614) 885-7800
796 Busch Ct
Columbus, OH


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

L & S Drywall And Flooring

614-376-8583
2222 Gerbert Road
Columbus, OH

Related Local Events
OTF - Ohio Turfgrass Conference and Show
Dates: 12/8/2009 - 12/10/2009
Location: Greater Columbus Convention Center
Columbus, OH
View Details

COLUMBUS BUILD, REMODEL & LANDSCAPE EXPO 2010
Dates: 1/1/2010 - 1/1/2010
Location: Greater Columbus Convention Center
Columbus, OH
View Details

APWA Public Works Congress & Exposition
Dates: 9/13/2009 - 9/16/2009
Location: Greater Columbus Convention Center
Columbus, OH
View Details

Enforcement Expo
Dates: 9/1/2009 - 9/2/2009
Location: Greater Columbus Convention Center
Columbus, OH
View Details

Offinger's Handcrafted Marketplace - August 2009
Dates: 8/15/2009 - 8/15/2009
Location: Franklin County Veterans Memorial Building
Columbus, OH
View Details