Attaching Deck Ledgers Dayton OH

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

Angler Construction Company Inc
(937) 228-5270
1524 E 2nd St
Dayton, OH
D & E Construction Solutions LLC
(937) 665-0727
8638 N Dixie Dr
Dayton, OH
construct one inc
937-277-5449
2747 armstrong lane
dayton, OH
B & D CONCRETE LLC
937-572-2107
128 S. MIAMI AVE
MIAMISBURG, OH
Icon Construction Inc
(937) 885-2299
10501 Success Ln Ste 101
Dayton, OH
Millennium Metals Inc
(937) 743-0560
7004 State Route 123
Franklin, OH
Green Point Metals
(937) 743-4075
301 Shotwell Drive
Franklin, OH
Mueller Gas Products/Propipe Group
(513) 424-5311
1800 Clayton Avenue
Middletown, OH
Piping of Ohio Inc.
(513) 988-5022
4922 Elk Creek Road
Middletown, OH
Dyer & Son Poured Walls
(513) 217-5764
6418 Elk Creek Road
Middletown, OH

 


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

Angler Construction Company Inc

(937) 228-5270
1524 E 2nd St
Dayton, OH
http://www.servicemaster.com

Related Local Events
Greater Cincinnati Remodeling Expo
Dates: 1/15/2010 - 1/15/2010
Location: Sharonville Convention Center
Sharonville, OH
View Details

World of Asphalt
Dates: 2/15/2010 - 2/18/2010
Location: Duke Energy Convention Center, Cincinnati
Cincinnati, OH
View Details

Greater Cincinnati Kitchen Bath & Design Show
Dates: 10/16/2009 - 10/18/2009
Location: Northern Kentucky Convention Center
Covington, KY
View Details