It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

Saving Oahu's Solar
808 3726691
2228 kaala way
honolulu, HI
Permtis Hawaii, LLC
(808) 923-0848
P.O. Box 15973
Honolulu, HI
Permits Hawaii
(808) 590-5911
P.O. Box 15973
Honolulu, HI
AAA Alliance Overhead Garage Doors
(808) 395-6776
1360 a palolo ave
honolulu, HI
Striker Construction
808-220-3842
1006 Puuwai Street
Honolulu, HI
Hawaii Hale Design Center
808-842-9404
306 Kalihi Street
Honolulu, HI
Design Associates Construction
(808) 239-2214
47-664 Kamehameha Hwy
Kaneohe, HI
Amt Construction LLC
(808) 674-0509
47-388 Hui Iwa St Ste 21
Kaneohe, HI
Sutton Construction Inc
(808) 233-2200
PO Box 4388
Kaneohe, HI
Coulson Construction Hawaii
(808) 235-6591
PO Box 5319
Kaneohe, HI


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

Saving Oahu's Solar

808 3726691
2228 kaala way
honolulu, HI

Related Local Events
Green Living Expo - Honolulu
Dates: 2/5/2010 - 2/6/2010
Location: Neal S. Blaisdell Center, Honolulu
Honolulu, HI
View Details

32nd Annual Home & Garden Show
Dates: 6/12/2009 - 6/14/2009
Location: Neal S. Blaisdell Center
Honolulu, IL
View Details