Attaching Deck Ledgers Miami FL

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

Ross & Baruzzini
(305) 477-8338
7205 NW 19th Street
Miami, FL
CDC Builders Inc
(305) 263-5198
5805 Blue Lagoon Dr
Miami, FL
Heery International, Inc.
(305) 441-1556
811 Ponce De Leon Blvd
Coral Gables, FL
Concrete.www.miamiartisticconcrete.com
305-224-2358
2081 sw 81 av
miami, FL
GREENLIGHT CONSTRUCTION
954-410-9331
7172 SW 47 STREET
MIAMI, FL
Lemartec Engineering & Construction Corp
(305) 661-9393
4800 SW 74th Ct
Miami, FL
Lemartec Engineering & Construction Corp
(305) 661-9393
4800- SW 74th Ct
Miami, FL
A & A Painting Services LLC
(786) 366 9486
211 NW 19 Ave
Miami, FL
Green Cay Village Homes
736-1440
3250 Mary St., #500
Coconut Grove, FL
3 C Construction
(305) 638-5511
3601 Nw 55th St
Miami, FL

  


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

Ross & Baruzzini

(305) 477-8338
7205 NW 19th Street
Miami, FL

Related Local Events
Miami (Spring) Home Design & Remodeling Show
Dates: 3/26/2010 - 3/29/2010
Location: Miami Beach Convention Center
Miami Beach, FL
View Details

IDEA - International Engineered Fabrics Conference & Expo
Dates: 4/27/2010 - 4/29/2010
Location: Miami Beach Convention Center
Miami Beach, FL
View Details

Ft.Lauderdale Home Design & Remodeling Show
Dates: 6/4/2010 - 6/6/2010
Location: Broward County Convention Center
Fort Lauderdale, FL
View Details

Annual Convention and Southeastern Trade Show
Dates: 7/14/2010 - 7/17/2010
Location: Marriott Doral Resort
Miami, FL
View Details

Miami Home Design & Remodeling
Dates: 9/3/2010 - 9/7/2010
Location: Miami Beach Convention Center
Miami Beach, FL
View Details