It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

Ryan Companies US, Inc.
(612) 492-4000
50 South 10th St., Ste. 300
Minneapolis, MN
American Chemical, Inc
(612) 522-4707
2201 North Second St.
Minneapolis, MN
Kraus-Anderson Construction Company
(612) 332-7281
525 South Eighth St.
Minneapolis, MN
Barrel Depot
(612) 290-7427
3209 Nicollet Ave
Minneapolis, MN
Stahl Construction Company
(952) 931-9300
5755 Wayzata Blvd
St. Louis Park, MN
Youngblood Lumber
(612) 789-3521
1335 Central Ave. N.E.
Minneapolis, MN
Otogawa-Anschel Design-Build
(612) 789-7070
1214 42nd Ave. N.
Minneapolis, MN
Consolidated Container
(612) 781-0923
109 27th Ave. N.E.
Minneapolis, MN
Siwek Lumber & Millwork
(612) 781-3333
2536 Marshall St. N.E
Minneapolis, MN
McLaughlin Gormley King Co
(763) 544-0341
8810 10th Ave. N
Golden Valley, MN


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

Ryan Companies US, Inc.

6124924000
50 South 10th St., Ste. 300
Minneapolis, MN

Related Local Events
MINNEAPOLIS HOME & LANDSCAPE EXPO 2010
Dates: 1/1/2010 - 1/1/2010
Location: Hubert H Humphery Metrodome
Minneapolis, MN
View Details

Minneapolis Home & Landscape Expo
Dates: 1/8/2010 - 1/10/2010
Location: Hubert H. Humphery Metrodome, Minneapolis
Minneapolis, MN
View Details

Home Improvement & Design Expo-Lakeville
Dates: 4/17/2010 - 4/18/2010
Location: Ames Arena, Lakeville
Lakeville, MN
View Details

Commercial Construction Show
Dates: 6/8/2010 - 6/10/2010
Location: Minneapolis Convention Center
Minneapolis, MN
View Details

Commercial Construction Show 2010
Dates: 6/8/2010 - 6/10/2010
Location: Minneapolis Convention Center
Minneapolis, MN
View Details