Attaching Deck Ledgers Oakland CA

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

Arrow Sign Company
510-533-7693
1051 46th Avenue
Oakland, CA
MBH Architects
(510) 865-8663
2470 Mariner Square Loop
Alameda, CA
Brad T Jones Construction
510-610-7625
909 Marina Village Parkway #664
Alameda, CA
HNTB Corporation
(510) 208-4599
1330 Broadway St., Ste. 1630
Oakland, CA
Rjd Construction
510 282 5513
6577 Valley View Road
Oakland, CA
CARLOS WELDING INC
510 463 7371
9911 GOULD ST
OAKLAND, CA
Labor Finders
(510) 678-3461
14780 Wicks Boulevard
San Leandro, CA
Bullzeye Installation
877-655-3667
16705 Los Reyes Ave
San Leandro, CA
Heller Manus Architects
(415) 247-1100
221 Main St., Ste. 940
San Francisco, CA
Lionakis Beaumont Design Group Inc.
(415) 777-4811
101 New Montgomery St., 6th Flr.
San Francisco, CA


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

Arrow Sign Company

510-533-7693
1051 46th Avenue
Oakland, CA
http://www.arrowsigncompany.com

Related Local Events
San Francisco Spring Home Show
Dates: 1/15/2010 - 1/17/2010
Location: Cow Palace
San Francisco, CA
View Details

DesignCon
Dates: 2/1/2010 - 2/4/2010
Location: Santa Clara Convention Center, Santa Clara
Santa Clara, CA
View Details

San Jose Spring Home Show
Dates: 3/12/2010 - 3/14/2010
Location: San Jose McEnery Convention Center
San Jose, CA
View Details

AAMA - American Architectural Manufacturers Association Western Region Spring Meeting 2010
Dates: 5/5/2010 - 5/6/2010
Location: Waterfront Plaza
Oakland, CA
View Details

PCBC - Pacific Coast Builders Conference 2010
Dates: 6/9/2010 - 6/11/2010
Location: Moscone Center
San Francisco, CA
View Details