Attaching Deck Ledgers Philadelphia PA

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

da Vinci by Design
(215) 769-2997
2230 N Delhi St
Philadelphia, PA
atlas wood products
215-725-5384
2101 w lippincott
philadelphia, PA
Clement Construction Co
(215) 988-9683
2200 Benjamin Franklin Pkwy
Philadelphia, PA
Brandywine Construction
(215) 923-1092
325 S 12th St
Philadelphia, PA
360 Cm
(215) 386-8700
269 S 44th St
Philadelphia, PA
Modesto Brito
215-744-4519
1659 Bridge st
philadelphia, PA
Auto Builders Inc
(215) 848-5949
6300 Wayne Ave
Philadelphia, PA
Amr Construction Inc
(215) 735-1422
712 S 12th St
Philadelphia, PA
Bond Construction
(215) 871-0270
5070 Parkside Ave
Philadelphia, PA
Chinos Construction & Removal
(215) 545-1966
1625 Washington Ave
Philadelphia, PA


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

da Vinci by Design

(215) 769-2997
2230 N Delhi St
Philadelphia, PA

Related Local Events
Jersey Shore Home Show
Dates: 1/15/2010 - 1/17/2010
Location: Brookdale Community College
Lincroft, NJ
View Details

Ocean County Home & Remodeling Show
Dates: 2/5/2010 - 2/7/2010
Location: Ritacco Center, Toms River
Toms River, NJ
View Details

Eastern PA Spring Home Show 2010
Dates: 2/19/2010 - 2/21/2010
Location: AG Hall, Allentown Fairgrounds
Allentown, PA
View Details

Greater Philadelphia Spring Home Show
Dates: 3/26/2010 - 3/28/2010
Location: Valley Forge Convention Center
King of Prussia, PA
View Details

19th Annual Renfrew Center Foundation Conference for Professionals
Dates: 11/12/2009 - 11/15/2009
Location: Philadelphia Airport Marriott
Philadelphia, PA
View Details