Attaching Deck Ledgers Phoenix AZ

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

Ecologically Responsible Building Inc.
480-575-6676
3150 N 24th Street
Phoenix, AZ
Phoenix Garage Doors
(602) 732-3256
1928 E. Highland Ave.
Phoenix, AZ
Landscape Gardens
(602) 395-1169
2022 W. Ironwood Drive
Phoenix, AZ
FISH CONSTRUCTION LLC
602-861-4984
1531 W PALMER DRIVE
PHOENIX, AZ
Exotic Metal Finishing
602 503 3700
10002 n 7st
phoenix, AZ
Arizona Public Service
(602) 250-4600
400 N. 5th Street, 10th Floor
Phoenix, AZ
Green Ideas, Inc.
602 6357925
1130 N 2nd
Phoenix, AZ
Southwest Gas Corporation
(877) 860-6020
9 S. 43rd Ave.
Phoenix, AZ
lopez plumbing
602 3583537
3617w roosbelt
phoenix, AZ
lopez plumbing
602 3583537
3617w roosbelt
phoenix, AZ


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

Ecologically Responsible Building Inc.

480-575-6676
3150 N 24th Street
Phoenix, AZ
http://www.ERbuilding.com

Related Local Events
ASLA - American Society of Landscape Architects - Annual Meeting & Expo
Dates: 9/28/2012 - 10/2/2012
Location: Phoenix Convention Center
Phoenix, AZ
View Details

Greenbuild International Conference & Expo
Dates: 11/11/2009 - 11/13/2009
Location: Phoenix Convention Center
Phoenix, AZ
View Details

Greenbuild Expo
Dates: 11/11/2009 - 11/13/2009
Location: Phoenix Convention Center
Phoenix, AZ
View Details

Sixth Annual Construction Industry Tax Issues Seminar
Dates: 6/17/2009 - 6/17/2009
Location: The Arizona Biltmore
Phoenix, AZ
View Details

Commercial Construction Show
Dates: 6/2/2009 - 6/4/2009
Location: Phoenix Convention Center
Phoenix, AZ
View Details