Attaching Deck Ledgers Sacramento CA

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

Capitol Painting & Construction
916-452-3277
Sacramento, CA
Mays Tile
916-226-322
2300 Capitol Ave
Sacramento, CA
Waltex Construction, Inc.
916 753 2200
P.O. Box 2440
West Sacramento, CA
HALM CONSTRUCTION dba HALM METAL FAB
916 992-6131
1550 VINCI AVE, #100
SACRAMENTO, CA
Energy Solutions
(916) 893-5934
3308 el camino ave Suite 300-410
sacramento, CA
S-FIVE Construction
(916) 607-5819
7560 South Parkway
Sacramento, CA
Spray Foam Energy Solutions
(916) 608-1847
9616 Elder Creek Road
Sacramento, CA
Advanced Roof Design, Inc.
916-381-2266
4 Wayne Court, Building #10
Sacramento, CA
Pacific Custom Woodworks
916 910 9402
4547 Stonebriar Ct
Antelope, CA
american enterpraises
916- 3391172
7473 holworthy way apt 299
sacramento, CA


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

Capitol Painting & Construction

Capitol Painting & Construction, your Commercial Tenant Improvement Specialists

916-452-3277
Sacramento, CA
www.capitolptg.com

Sacramento based Construction company specializing in Commercial Tenant Improvements and specialty coatings.

Related Local Events
Business Issues Committee Meeting
Dates: 6/26/2009 - 6/26/2009
Location: Fairfield-Suisun Chamber of Commerce
Fairfield, CA
View Details

Executive Board Meeting
Dates: 6/23/2009 - 6/23/2009
Location: Fairfield-Suisun Chamber of Commerce
Fairfield, CA
View Details

Membership Committee Meeting
Dates: 6/18/2009 - 6/18/2009
Location: Fairfield-Suisun Chamber of Commerce
Fairfield, CA
View Details

Suisun City Business Group Meeting
Dates: 6/18/2009 - 6/18/2009
Location: Suisun City Council Chambers
Suisun, CA
View Details

Travis Regional Armed Forces Committee Meeting
Dates: 6/15/2009 - 6/15/2009
Location: Delta Breeze Club, Travis AFB
Travis AFB, CA
View Details