Attaching Deck Ledgers Saint Louis MO

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

OSHA Authorized Instructor
314.608.0142
www.1wp.com/go/AVE
St. Louis, MO
Show-Me Granite LLC
314-267-2087
2321 Wengler Avenue
Saint Louis, MO
AMSL: Architectural Millwork
(314) 524-0602
8417 Chapin Industrial Drive
St. Louis, MO
AMSL: Architectural Millwork
(314) 524-0602
8417 Chapin Industrial Drive
St. Louis, MO
Show-Me Granite LLC
314-267-2087
2321 Wengler Avenue
St. Louis, MO
Sharp electric
314 3065875
po box 4328
affton, MO
EZ Pavement Repair L.L.C.
877-365-USPAVE
12685 Dorsett Road
Saint Louis, MO
Kraze Construction
636-288-2817
200 Waterford
florissant, MO
archway construction and remodeling
314-221-5392
2010 bently manor
st. louis, MO
Faber Contracting
618.779.4030
2121 Park Road.
Belleville, IL


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

OSHA Authorized Instructor

314.608.0142
www.1wp.com/go/AVE
St. Louis, MO

Related Local Events
Gateway Spring Home Show
Dates: 1/22/2010 - 1/24/2010
Location: Gateway Center
Collinsville, IL
View Details

Gateway, Collinsville, IL Fall Home Show
Dates: 9/25/2009 - 9/27/2009
Location: Gateway Center
Collinsville, IL
View Details

Gateway Fall Home Show September
Dates: 9/25/2009 - 9/27/2009
Location: Gateway Center
Collinsville, IL
View Details

Fall Home Show-Collinsville
Dates: 9/25/2009 - 9/27/2009
Location: Gateway Center, Collinsville
Collinsville, IL
View Details

ASTM Committee Meetings
Dates: 6/6/2009 - 6/11/2009
Location:
St, Louis, MO
View Details