Attaching Deck Ledgers San Francisco CA

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

SMWM
(415) 546-0400
989 Market St., 3rd Flr.
San Francisco, CA
Structoris, Inc.
(415) 437-3104
174 14th St.
San Francisco, CA
NRG Energy Center San Francisco
(415) 777-3415
54 Mint St., Ste. 200
San Francisco, CA
Krueger Bros.
(415) 863-5846
535 Alabama
San Francisco, CA
Aaliya's custom painting
714 809 3943
2333 folsom st
san francisco, CA
Jennings Ackerley Architecture + Design
(415) 538-1777
333 Bryant St., Ste. 220
San Francisco, CA
K2A, LLP
(415) 487-6900
444 De Haro St., Ste. 220
San Francisco, CA
Michael Tauber Architecture
(415) 252-7044
2325 Third St., Ste. 322
San Francisco, CA
Perkins+Will
(415) 856-3022
185 Berry St., Ste. 5100
San Francisco, CA
Metropolitan Electrical Construction Inc.
(415) 642-3000
2400 Third St.
San Francisco, CA


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

SMWM

(415) 546-0400
989 Market St., 3rd Flr.
San Francisco, CA

Related Local Events
San Francisco Spring Home Show
Dates: 1/15/2010 - 1/17/2010
Location: Cow Palace
San Francisco, CA
View Details

DesignCon
Dates: 2/1/2010 - 2/4/2010
Location: Santa Clara Convention Center, Santa Clara
Santa Clara, CA
View Details

San Jose Spring Home Show
Dates: 3/12/2010 - 3/14/2010
Location: San Jose McEnery Convention Center
San Jose, CA
View Details

AAMA - American Architectural Manufacturers Association Western Region Spring Meeting 2010
Dates: 5/5/2010 - 5/6/2010
Location: Waterfront Plaza
Oakland, CA
View Details

PCBC - Pacific Coast Builders Conference 2010
Dates: 6/9/2010 - 6/11/2010
Location: Moscone Center
San Francisco, CA
View Details