Attaching Deck Ledgers Seattle WA

It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Local Companies

LMN Architects
(206) 682-3460
801 2nd Ave., Ste. 501
Seattle, WA
Ruffcorn Mott Hinthorne Stine
(206) 405-4443
810 3rd Ave., Ste. 220
Seattle, WA
SRG Partnership, Inc.
(206) 973-1700
101 Yesler Way, Ste. 200
Seattle, WA
atelierjones llc
(206) 624-9966
911 Western Ave., Ste. 440
Seattle, WA
CollinsWoerman
(206) 245-2100
710 2nd Ave., Ste. 1400
Seattle, WA
INTEGRUS Architecture
(206) 628-3137
117 S Main St., Ste. 100
Seattle, WA
Zimmer Gunsul Frasca Architects LLP
(206) 623-9414
925 4th Ave., Ste. 2400
Seattle, WA
Construction Systems Management, Inc.
(206) 233-0804
811 1st Ave.
Seattle, WA
Amtrak-West
(800) 872-7245
303 S Jackson St.
Seattle, WA
DLR Group
(206) 461-6000
901 5th Ave., Ste. 700
Seattle, WA


It is common building practice to use flashing to keep moisture from getting between the house and the ledger. The Uniform Building Code requires flashing, and many contractors meet the requirement by installing an L-shaped piece of metal. The horizontal leg covers the top of the ledger and the vertical leg goes up the wall and is lapped by the building paper and siding above.

Most carpenters install the ledger in the same plane as the joists, so the deck surface ends up an inch or more higher than the horizontal leg of the flashing. This creates a perfect collection zone because if something falls in toward the house, the flashing will prevent it from falling through to the ground. If enough organic matter collects on the flashing, it can induce rot in the adjoining deck board or invade the siding above.

The simplest way to deal with this problem is to use a ledger that is taller than the joists and install it so the top edge will be in the same plane as the deck boards once those are installed.

You still need to flash the connection, but the flashing should come down the wall from behind the siding and building paper, run across the top of the ledger, and end in a lip that laps down the face (see illustration below). —Adapted from “Rot Resistant Deck Details,” by Kim Katwijk, which first appeared in the April 2005 issue ofThe Journal of Light Construction (www.jlconline.com), a sister publication to REMODELING.

No End Date for this image

Debris-Free Ledger

 
  • Save / S

Click here to read full article from Remodeling

Featured Local Company

LMN Architects

(206) 682-3460
801 2nd Ave., Ste. 501
Seattle, WA
http://www.lmnarchitects.com/index.asp

Related Local Events
Shoreline Living Workshop
Dates: 12/3/2009 - 12/3/2009
Location: Griffin Fire Hall
Olympia, WA
View Details

Northwest Builders Show
Dates: 12/7/2009 - 12/9/2009
Location: Meydenbauer Convention Center
Bellevue, WA
View Details

Northwest Builders Show
Dates: 12/8/2009 - 12/9/2009
Location: Meydenbauer Center, Seattle
Bellevue, WA
View Details

Tacoma Remodeling Expo
Dates: 3/12/2010 - 3/14/2010
Location: Greater Tacoma Convention & Trade Center
Tacoma, WA
View Details

ASLA - American Society of Landscape Architects - Annual Meeting & Expo
Dates: 9/30/2011 - 10/4/2011
Location: Washington State Convention and Trade Center
Seattle, WA
View Details