Our trusty building envelope and moisture control experts provide eight must-follow rules for designing effective roof systems.

Local Companies

Fortune Roofing Inc
(305) 669-5529
2889 SW 69th Ct
Miami, FL
Del Sol Roofing
(305) 228-0218
8311 SW 31st St
Miami, FL
LMJO Inc
(305) 554-6968
4658 SW 75th Ave
Miami, FL
A Perfect Seal Roofing
(305) 477-1554
7905 NW* 66th St
Miami, FL
A Perfect Seal Roofing
(305) 477-1554
7905 NW 66th St
Miami, FL
Brady Roofing And Sheet Metal
(305) 592-0011
8490 NW 64th St
Miami, FL
Mepic Roofing Corp
(305) 758-7503
598 NW 54th St
Miami, FL
RAM Roofing
305-370-5464
5712 NE 4th AVE
Miami, FL
Professional Roofing & Sales
305-235-5133
10402 SW 186 Terr
Cutler Bay, FL
Palm Roofing
(305) 235-3833
16990 SW 96th Ct
Miami, FL

provided by: Building Design and Construction

1. Refer to the NRCA Roofing Manual and FM Global Property Loss Prevention Data Sheets.

?A common mistake made when these documents are not followed is that roof-edge fascias end up being inadequately secured,? says Judd Peterson, AIA, president of Judd/Allen Group, Edina, Minn.

2. Install wood cants that are not pressure-treated against decay around parapet perimeters.

?Pressure-treated cants tend to warp after installation, particularly in heat, and pull coping flashings apart,? says Peterson. He recommends that subflashing membranes be lapped over parapet blocking. Also, use neoprene-gasketed, stainless-steel screws to attach sheet metal flashings and counter-flashings.

?For single-ply roofing, cants may be omitted, but at the very least use wood blocking to provide a place to secure the edge of the roofing,? adds Richard Keleher, AIA, CSI, LEED, senior architect at Richard Keleher Architect, Concord, Mass. ?A common mistake is to fail to connect the roofing system to the air barrier of the exterior wall.?

3. Elevate perimeters of roofing deck surface with canted and tapered insulations.

?This will help keep water away from curb flashings,? says Peterson.

4. Provide continuous vapor barriers on the decks, under the roofing.

For roofs installed over metal decks on low-humidity structures, such as office buildings, the vapor barrier may be omitted, says Peterson. ?This makes it easier to find leaks.?

5. Beware of the following:

? Coal-tar pitch roofs will flow even in the coldest temperatures and must be designed with the correct slope, perimeter felt layer enveloping, and sump scuppers with grates to avoid sloughing down drains.

? Asphalt roofing will release its solvent oils and dry out, particularly where the roof is not sloped enough and ponding occurs.

? Heat-welded or solvent-glued membrane seams can be discontinuous or fail, even if installed properly, particularly in below-grade applications.

? Leaks through loose-laid membranes are nearly impossible to find and repair. Always fully adhere the roofing membranes.

6. Double-check the rain leader piping that runs down through the building for chases and conflicts with the structure and building spaces.

Keleher also suggests insulating the underside of drain pans with one inch of spray polyurethane foam to prevent condensation on the pan, particularly in a climate like New England's. ?I also insulate the piping for 10 feet with a vapor barrier jacket on the insulation,? says Keleher.

7. Verify the thickness of insulation and the elevation of the deck height and perimeter through-wall flashing.

Verify tapered insulation requirements and determine whether an additional drain would minimize tapering work. ?A common mistake here is to randomly locate roof drains without consideration of the constraints of tapered insulation,? says Peterson.

8. Show detailed drawings requiring base flashings and curb flashings, but only if you know which manufactured system is being used.

?Avoid providing details that call out elements of the roofing system that disagree with manufacturers' details,? says Keleher. ?Oftentimes, we don't know which manufacturer is being used.?

However, if the manufacturer is known, providing the base and curb flashing details can help to anticipate the drainage slopes against adjacent perimeter wall materials and to coordinate flashing levels, weeps, and lapping of materials.

?Too often, these are not detailed and not coordinated,? says Peterson. ?What happens is, the masonry work goes in first, and then the roofing comes in higher than the flashing level. The correction is ugly, difficult, and time-consuming, and just when the owner expected the roofing to be completed and the building to be kept dry.?

Richard Keleher can be reached at 978-369-4550;kel@rkeleher.com. Judd Peterson can be reached at 952-224-5050;jpeterson@juddallen.com.



author: Staff

Building Design and Construction. Copyright © 2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.

Featured Local Company

Fortune Roofing Inc

(305) 669-5529
2889 SW 69th Ct
Miami, FL

Related Local Event
Annual Convention and Southeastern Trade Show
Dates: 7/14/2010 - 7/17/2010
Location: Marriott Doral Resort
Miami, FL
View Details