Conceptual Home Sketches Boulder CO

Four conceptual sketches addressing the entry and window plan for this remodel's new A-gable end hide larger issues. Read the following articles and get more information about that.

Local Companies

Architecture Inc.
303 444-6902
3008 Folsom Street
Boulder, CO
Arch 11 inc
303.546.6868
3100 carbon place
boulder, CO
Bornengineering
(303) 426-1731
1130 West 124th Ave., Suite 100
Westminster, CO
Smith Environmental & Engineering
(720) 887-4928
12071 Tejon St. #470
Westminster, CO
MBR Electric, Inc
(303) 430-8840
7135 Newton St.
Westminster, CO
APPLIED ELEVATOR SERVICE & SALES
303423-3538
10976 W 55th Ln
Arvada, CO
Mendoza Used Brick & Demolition
(303) 427-1201
701 W. 64 Ave.
Denver, CO
Hamilton Electric Construction Company
(303) 451-5855
10855 Irma Drive
Northglenn, CO
North/Western Electrical Corporation of Colorado
(303) 452-8576
10825 Irma Drive
Northglenn, CO
DJ's Snowplowing & Maintenance, Inc.
(303) 289-7000
2555 E. Highway 224
Denver, CO


Go to main article BEFORE AFTER: A Team

Four conceptual sketches addressing the entry and window plan for this remodel's new A-gable end hide larger issues.

No End Date for this image

Sketch 1

No End Date for this image

Sketch 2

In the first three sketches, architect Alan Freysinger conceptualized a roof identical, ridge to eaves, to that of the existing house. But those plans squeezed useable space at the knee wall, and space became even tighter when his client added an office and back entrance for visitors coming in from skiing or swimming. The second sketch shows a concept addressing front and back entrances, but Freysinger says the static design over-relied on the A motif. "The aesthetics didn't seem right," he says.

In the end (sketch four), Freysinger eliminated the matching roof and low knee wall, designing a less steep roof (13/12 vs. 15/12 pitch) and 8-foot bearing walls. This allows more useable interior space and a ridge line that joins nicely with the extended home. It also keeps the addition subordinate to the main structure.

No End Date for this image

Sketch 3

No End Date for this image

Sketch 4

Instead of using his original plan for a wall of glass, the architect settled on a half-wall of windows, which draws a visitor's attention away from the window and focuses it on the helical stair. The window plan also diminishes the A motif. Taller bearing walls (sketch four) increase the useable interior space by 5 feet on each side. In the same sketch, the addition also was lengthened about 6 feet.

Click here to read full article from Remodeling

Featured Local Company

Architecture Inc.

303 444-6902
3008 Folsom Street
Boulder, CO
arch-inc.com

Related Local Events
Red Carpet Reception featuring Bennett Construction Company
Dates: 10/22/2009 - 10/22/2009
Location: Fort Collins CO Chamber of Commerce
Fort Collins, CO
View Details

Multi Housing World
Dates: 10/1/2009 - 10/2/2009
Location: Colorado Convention Center, Denver
Denver, CO
View Details

MULTI-HOUSING WORLD CONFERENCE & EXPO
Dates: 10/1/2009 - 10/3/2009
Location: Colorado Convention Center
Denver, CO
View Details

PHOTOVOLTAICS BEYOND CONVENTIONAL SILICON - USA
Dates: 9/15/2009 - 9/17/2009
Location: Hyatt Convention Center Hotel
Denver, CO
View Details

7th International Energy Conversion Engineering Conference & Exhibit (IECEC
Dates: 8/2/2009 - 8/5/2009
Location: Colorado Convention Center
Denver, CO
View Details