Conceptual Home Sketches Dayton OH

Four conceptual sketches addressing the entry and window plan for this remodel's new A-gable end hide larger issues. Read the following articles and get more information about that.

Local Companies

Steve Anderson Construction
(937) 294-4800
Dayton, OH
Jabez Development Corp
(937) 222-4128
1116 W Stewart St
Dayton, OH
Sunesis Construction
(937) 222-7158
501 Washington St
Dayton, OH
Shook Construction
(937) 276-6666
4977 Northcutt Pl
Dayton, OH
Madda Enterprises
(937) 222-0565
510 N Broadway St
Dayton, OH
A K A Construction
(937) 277-5668
3705 Lori Sue Ave
Dayton, OH
Mainline Road & Bridge Construction
(937) 278-1600
5470 N Main St
Dayton, OH
Wise Construction Company Inc
(937) 854-0281
1705 Guenther Rd
Dayton, OH
Madriver Construction
(937) 253-5665
4806 Sheller Ave
Dayton, OH
Steiner and Associates
(937) 426-5427
75 Harbert Dr
Dayton, OH


Go to main article BEFORE AFTER: A Team

Four conceptual sketches addressing the entry and window plan for this remodel's new A-gable end hide larger issues.

No End Date for this image

Sketch 1

No End Date for this image

Sketch 2

In the first three sketches, architect Alan Freysinger conceptualized a roof identical, ridge to eaves, to that of the existing house. But those plans squeezed useable space at the knee wall, and space became even tighter when his client added an office and back entrance for visitors coming in from skiing or swimming. The second sketch shows a concept addressing front and back entrances, but Freysinger says the static design over-relied on the A motif. "The aesthetics didn't seem right," he says.

In the end (sketch four), Freysinger eliminated the matching roof and low knee wall, designing a less steep roof (13/12 vs. 15/12 pitch) and 8-foot bearing walls. This allows more useable interior space and a ridge line that joins nicely with the extended home. It also keeps the addition subordinate to the main structure.

No End Date for this image

Sketch 3

No End Date for this image

Sketch 4

Instead of using his original plan for a wall of glass, the architect settled on a half-wall of windows, which draws a visitor's attention away from the window and focuses it on the helical stair. The window plan also diminishes the A motif. Taller bearing walls (sketch four) increase the useable interior space by 5 feet on each side. In the same sketch, the addition also was lengthened about 6 feet.

Click here to read full article from Remodeling

Featured Local Company

Paul Architectural Group, PS Co.

513-899-9400
5684 Lundy-Whitacre Rd.
Morrow, OH

Related Local Event
Greater Cincinnati Kitchen Bath & Design Show
Dates: 10/16/2009 - 10/18/2009
Location: Northern Kentucky Convention Center
Covington, KY
View Details