Conceptual Home Sketches Los Angeles CA

Four conceptual sketches addressing the entry and window plan for this remodel's new A-gable end hide larger issues. Read the following articles and get more information about that.

Local Companies

KV and Company Inc.
213-316-0150
635 S. Olive St
Los Angeles, CA
Christopher Compton Architect LLP
818 841 5045
4000
bURBANK ca, CA
Moses Architecture
310-745-7100
420 Howland Canal
Venice, CA
Culver Architects Inc.
310.306.2272
2467 Lincoln Blvd
Venice, CA
Sintesi Design
310 394 9496
1119 Colorado ave#2
santa monica, CA
EON Design Co.
(323) 459-5005
2629 Foothill Blvd. Suite 281
La Crescenta, CA
Absolute Design Group, Inc
310-373-4060
1820 Sth Elena Avenue, Suite G
Redondo Beach, CA
Matson Architects Inc.
(562) 402-9100
13271 South Street
Cerritos, CA
Lighting Professionals Inc.
310-750-6886
Serving your area
Rancho Palos Verdes, CA
Lee Kye Won
(323) 664-7784
124 N Oxford Ave
Los Angeles, CA


Go to main article BEFORE AFTER: A Team

Four conceptual sketches addressing the entry and window plan for this remodel's new A-gable end hide larger issues.

No End Date for this image

Sketch 1

No End Date for this image

Sketch 2

In the first three sketches, architect Alan Freysinger conceptualized a roof identical, ridge to eaves, to that of the existing house. But those plans squeezed useable space at the knee wall, and space became even tighter when his client added an office and back entrance for visitors coming in from skiing or swimming. The second sketch shows a concept addressing front and back entrances, but Freysinger says the static design over-relied on the A motif. "The aesthetics didn't seem right," he says.

In the end (sketch four), Freysinger eliminated the matching roof and low knee wall, designing a less steep roof (13/12 vs. 15/12 pitch) and 8-foot bearing walls. This allows more useable interior space and a ridge line that joins nicely with the extended home. It also keeps the addition subordinate to the main structure.

No End Date for this image

Sketch 3

No End Date for this image

Sketch 4

Instead of using his original plan for a wall of glass, the architect settled on a half-wall of windows, which draws a visitor's attention away from the window and focuses it on the helical stair. The window plan also diminishes the A motif. Taller bearing walls (sketch four) increase the useable interior space by 5 feet on each side. In the same sketch, the addition also was lengthened about 6 feet.

Click here to read full article from Remodeling

Featured Local Company

KV and Company Inc.

213-316-0150
635 S. Olive St
Los Angeles, CA
www.kvcoinc.com

Related Local Events
AACE - Association for the Advancement of Cost Engineering International's 55th Annual Meeting
Dates: 6/19/2011 - 6/22/2011
Location: Disneyland Resort Mickey & Friends Parking Structure
Anaheim, CA
View Details

2011 Urban Land Institute Fall Meeting And Urban Land Expo
Dates: 10/25/2011 - 10/28/2011
Location: Los Angeles Convention Center
Los Angeles, CA
View Details

Building Industry Show
Dates: 11/19/2009 - 11/20/2009
Location: Long Beach Convention Center
Long Beach, CA
View Details

BIS - Building Industry Show
Dates: 11/19/2009 - 11/20/2009
Location: Long Beach Convention Center
Long Beach, CA
View Details

Material World West & Technology Solutions LA
Dates: 9/30/2009 - 10/2/2009
Location: Los Angeles Convention Center
Los Angeles, CA
View Details