Conceptual Home Sketches Oakland CA

Four conceptual sketches addressing the entry and window plan for this remodel's new A-gable end hide larger issues. Read the following articles and get more information about that.

Local Companies

MBH Architects
(510) 865-8663
2470 Mariner Square Loop
Alameda, CA
HNTB Corporation
(510) 208-4599
1330 Broadway St., Ste. 1630
Oakland, CA
Biggs Group
510-893-0264
1322 Webster Street
Oakland, CA
Heller Manus Architects
(415) 247-1100
221 Main St., Ste. 940
San Francisco, CA
Lionakis Beaumont Design Group Inc.
(415) 777-4811
101 New Montgomery St., 6th Flr.
San Francisco, CA
Austin AECOM
(415) 362-0300
405 Howard St., Ste. 400
San Francisco, CA
Jennings Ackerley Architecture + Design
(415) 538-1777
333 Bryant St., Ste. 220
San Francisco, CA
K2A, LLP
(415) 487-6900
444 De Haro St., Ste. 220
San Francisco, CA
Michael Tauber Architecture
(415) 252-7044
2325 Third St., Ste. 322
San Francisco, CA
Perkins+Will
(415) 856-3022
185 Berry St., Ste. 5100
San Francisco, CA


Go to main article BEFORE AFTER: A Team

Four conceptual sketches addressing the entry and window plan for this remodel's new A-gable end hide larger issues.

No End Date for this image

Sketch 1

No End Date for this image

Sketch 2

In the first three sketches, architect Alan Freysinger conceptualized a roof identical, ridge to eaves, to that of the existing house. But those plans squeezed useable space at the knee wall, and space became even tighter when his client added an office and back entrance for visitors coming in from skiing or swimming. The second sketch shows a concept addressing front and back entrances, but Freysinger says the static design over-relied on the A motif. "The aesthetics didn't seem right," he says.

In the end (sketch four), Freysinger eliminated the matching roof and low knee wall, designing a less steep roof (13/12 vs. 15/12 pitch) and 8-foot bearing walls. This allows more useable interior space and a ridge line that joins nicely with the extended home. It also keeps the addition subordinate to the main structure.

No End Date for this image

Sketch 3

No End Date for this image

Sketch 4

Instead of using his original plan for a wall of glass, the architect settled on a half-wall of windows, which draws a visitor's attention away from the window and focuses it on the helical stair. The window plan also diminishes the A motif. Taller bearing walls (sketch four) increase the useable interior space by 5 feet on each side. In the same sketch, the addition also was lengthened about 6 feet.

Click here to read full article from Remodeling

Featured Local Company

MBH Architects

(510) 865-8663
2470 Mariner Square Loop
Alameda, CA

Related Local Events
DesignCon
Dates: 2/1/2010 - 2/4/2010
Location: Santa Clara Convention Center, Santa Clara
Santa Clara, CA
View Details

AAMA - American Architectural Manufacturers Association Western Region Spring Meeting 2010
Dates: 5/5/2010 - 5/6/2010
Location: Waterfront Plaza
Oakland, CA
View Details

PCBC - Pacific Coast Builders Conference 2010
Dates: 6/9/2010 - 6/11/2010
Location: Moscone Center
San Francisco, CA
View Details

Pacific Coast Industrial & Machine Tool Show
Dates: 11/10/2009 - 11/12/2009
Location: Santa Clara Convention Center
Santa Clara, CA
View Details

2009 Urban Land Institute Fall Meeting And Urban Land Expo
Dates: 11/3/2009 - 11/6/2009
Location: Moscone South Convention Center
San Francisco, CA
View Details