Conceptual Home Sketches Portland OR

Four conceptual sketches addressing the entry and window plan for this remodel's new A-gable end hide larger issues. Read the following articles and get more information about that.

Local Companies

HDR Architecture
(503) 423-3700
1001 SW Fifth Avenue
Portland, OR
KPFF Consulting Engineers
(503)2273251
111 SW 5th Avenue
Portland, OR
Mulvanny G2 Architecture
(503) 223-8030
601 SW 2nd Avenue, Suite 1200
Portland, OR
Yost Grube Hall Architecture
(503) 221-0150
1211 SW 5th Avenue
Portland, OR
Zimmer Gunsul Frasca Architects LLP
(503) 224-3860
320 SW Oak Street
Portland, OR
Precision Images
(503)2742030
900 S.E. Sandy Blvd.
Portland, OR
Baysinger Partners Architecture PC
(503) 546-1600
1006 SE Grand Avenue
Portland, OR
Snyder & Snyder Architects
(503)2245356
1033 S.W. Yamhill Street, #405
Portland, OR
SRG Partnership, Inc
(503) 222-1917
621 SW Morrison Street
Portland, OR
GBD Architects Incorporated
(503) 224-9656
1120 N.W. Couch Street, #300
Portland, OR


Go to main article BEFORE AFTER: A Team

Four conceptual sketches addressing the entry and window plan for this remodel's new A-gable end hide larger issues.

No End Date for this image

Sketch 1

No End Date for this image

Sketch 2

In the first three sketches, architect Alan Freysinger conceptualized a roof identical, ridge to eaves, to that of the existing house. But those plans squeezed useable space at the knee wall, and space became even tighter when his client added an office and back entrance for visitors coming in from skiing or swimming. The second sketch shows a concept addressing front and back entrances, but Freysinger says the static design over-relied on the A motif. "The aesthetics didn't seem right," he says.

In the end (sketch four), Freysinger eliminated the matching roof and low knee wall, designing a less steep roof (13/12 vs. 15/12 pitch) and 8-foot bearing walls. This allows more useable interior space and a ridge line that joins nicely with the extended home. It also keeps the addition subordinate to the main structure.

No End Date for this image

Sketch 3

No End Date for this image

Sketch 4

Instead of using his original plan for a wall of glass, the architect settled on a half-wall of windows, which draws a visitor's attention away from the window and focuses it on the helical stair. The window plan also diminishes the A motif. Taller bearing walls (sketch four) increase the useable interior space by 5 feet on each side. In the same sketch, the addition also was lengthened about 6 feet.

Click here to read full article from Remodeling

Featured Local Company

HDR Architecture

5034233700
1001 SW Fifth Avenue
Portland, OR

Related Local Events
WOOD TECHNOLOGY CLINIC & SHOW 2010
Dates: 3/9/2010 - 3/11/2010
Location: Oregon Convention Center
Portland, OR
View Details

North American Tunneling Conference
Dates: 6/12/2010 - 6/16/2010
Location: Marriott Waterfront Downtown
Portland, OR
View Details

Northwest Design-2-Part Show - Portland, OR
Dates: 9/16/2009 - 9/17/2009
Location: Portland Expo Center
Portland, OR
View Details

American Institute of Building Design Annual Convention and Trade Show
Dates: 7/8/2009 - 7/11/2009
Location: Portland Marriott Downtown Waterfront
Portland, OR
View Details