Conceptual Home Sketches Sacramento CA

Four conceptual sketches addressing the entry and window plan for this remodel's new A-gable end hide larger issues. Read the following articles and get more information about that.

Local Companies

Pinerworks Architecture and Building Group
916-444-7115
919 20th Street
Sacramento, CA
Above & Beyond Building Design
916.944.4088
8037 Fair Oaks Blvd.
Carmichael, CA
Teichert Construction
530-406-4200
P.O. BOX 1890
Davis, CA
Two Rivers Architects
916-358-7555
13405 Folsom Blvd. Bldg. 300
Folsom, CA
WLC Architects
916.355.9922
1110 Iron Point Rd
Folsom, CA
Chipman & Shuker
(916) 485-1111
2737 Fulton Ave
Sacramento, CA
Hurley Construction
(916) 441-0691
2110 L St
Sacramento, CA
Montgomery Wstn Harza
(916) 739-0681
3321 Power Inn Rd
Sacramento, CA
William Carter Company
(916) 649-2100
2323 Lexington St
Sacramento, CA
Fcpc Llc
(916) 419-6741
1739 Iverson Way
Sacramento, CA


Go to main article BEFORE AFTER: A Team

Four conceptual sketches addressing the entry and window plan for this remodel's new A-gable end hide larger issues.

No End Date for this image

Sketch 1

No End Date for this image

Sketch 2

In the first three sketches, architect Alan Freysinger conceptualized a roof identical, ridge to eaves, to that of the existing house. But those plans squeezed useable space at the knee wall, and space became even tighter when his client added an office and back entrance for visitors coming in from skiing or swimming. The second sketch shows a concept addressing front and back entrances, but Freysinger says the static design over-relied on the A motif. "The aesthetics didn't seem right," he says.

In the end (sketch four), Freysinger eliminated the matching roof and low knee wall, designing a less steep roof (13/12 vs. 15/12 pitch) and 8-foot bearing walls. This allows more useable interior space and a ridge line that joins nicely with the extended home. It also keeps the addition subordinate to the main structure.

No End Date for this image

Sketch 3

No End Date for this image

Sketch 4

Instead of using his original plan for a wall of glass, the architect settled on a half-wall of windows, which draws a visitor's attention away from the window and focuses it on the helical stair. The window plan also diminishes the A motif. Taller bearing walls (sketch four) increase the useable interior space by 5 feet on each side. In the same sketch, the addition also was lengthened about 6 feet.

Click here to read full article from Remodeling

Featured Local Company

Pinerworks Architecture and Building Group

916-444-7115
919 20th Street
Sacramento, CA

Related Local Events
Business Issues Committee Meeting
Dates: 6/26/2009 - 6/26/2009
Location: Fairfield-Suisun Chamber of Commerce
Fairfield, CA
View Details

Executive Board Meeting
Dates: 6/23/2009 - 6/23/2009
Location: Fairfield-Suisun Chamber of Commerce
Fairfield, CA
View Details

Membership Committee Meeting
Dates: 6/18/2009 - 6/18/2009
Location: Fairfield-Suisun Chamber of Commerce
Fairfield, CA
View Details

Suisun City Business Group Meeting
Dates: 6/18/2009 - 6/18/2009
Location: Suisun City Council Chambers
Suisun, CA
View Details

Travis Regional Armed Forces Committee Meeting
Dates: 6/15/2009 - 6/15/2009
Location: Delta Breeze Club, Travis AFB
Travis AFB, CA
View Details