Concrete Base Cheney WA

Will my concrete base be suitable for a concrete sectional garage replacement? What about access to the site? Will planning permission be required?

Local Companies

Adventurs in Organizing
509-342-4163
N G Street
spokane, WA
Olympic Concrete Contracting
(360) 452-1560
52321 Highway 112
Port Angeles, WA
Channing Construction Inc
(253) 863-4992
7209 Myers Rd E
Bonney Lake, WA
Anchor Concrete
(360) 254-9750
Vancouver, WA
Roys Construction
(360) 695-5649
3510 NE 53rd St
Vancouver, WA
The Concrete Company Inc
(425) 746-7055
1420 NW Gilman Blvd # 2547
Issaquah, WA
Bergen Al Concrete Foundation
(509) 238-4127
4125 E Beauty Ln
Colbert, WA
R & R Concrete Inc
(425) 788-0506
18241 NE 196th St
Woodinville, WA
Elliott & Sons Construction Inc
(509) 966-3746
11721 Zier Rd
Yakima, WA
Trautmann Specialty Coatings
(509) 927-5980
Spokane, WA

Provided by: 

Will my concrete base be suitable for a concrete sectional garage replacement? What about access to the site? Will planning permission be required?

What about access to the site? Will planning permission be required? All common questions levied by prospective customer’s interest in replacing or the addition of a concrete sectional garage to their home.
Tolerances vary between manufacturers greatly but for the majority of manufacturers who employ (rather than sub-contract) their installation, the following rules apply.

1/ it isn't necessary for your concrete base to be perfectly level and to a moderate degree a concrete building can built within certain tolerances. Always if you are in doubt arrange for the dealer to perform a survey but as a general rule most PENT roof garages on bases which fall consistency more than 1in(25mm) or APEX 2in(50mm) in any direction cannot be built.

2/ its recommended that a concrete floor be 6in (150mm) longer and wider that the proposed structure (most manufactures quote external concrete garage dimensions). Whilst again this isn’t an absolute, do be mindful that your base must also be square otherwise the garage may ‘fall’ off the base.

Concrete garages are delivered by HGV and 7.5t rigid vehicles and so ideally, (but not an absolute requirement) will a wagon is able to park alongside your drive? As forklift delivery is preferred, will 8ft access be available with no height restriction? It is likely that you will be provided with the opportunity to complete a ‘Help the Driver’ form to advise on any access difficulties.

Has Planning Permission or Building Control has been approved? Since OCT-2008, rules have changed but this doesn’t offer a complete exemption.
What’s in a guarantee? When qualified and employed installers are substituted for sub-contractors (on piece work) quality of installation will inevitably suffer. Ask the question, ‘are your installers employed’ if the answer is no then it is suggested that you walk away.

For more information, go to Realfamiliesrealfun.com.

Featured Local Company

Adventurs in Organizing

509-342-4163
N G Street
spokane, WA