Input-Protection Components Portland OR

The following contains computer software information you should know about input-protection components. Read on if you or a loved one is interested in computer electronics and staying computer savvy in Portland.

Local Companies

National Builders Hardware Co.
(503)233-5381
P.O. Box 14609
Portland, OR
Lovett Excavation
(503) 442-8611
5100 SE Harney
Portland, OR
Transmission Exchange Co.
(503)284-0768
1803 N.E. MLK Jr. Blvd
Portland, OR
United Pipe & Supply Company, Inc.
503-788-8813
7600 SE Johnson Creek Blvd.
Portland, OR
Cessco, Inc.
503-288-1242
4222 N.E. Columbia Blvd
Portland, OR
Northwest Pipe Company
(800) 824-9824
12005 N. Burgard
Portland, OR
1st Independent Leasing, Inc.
503-626-3486
3800 SW Cedar Hills Blvd.
Beaverton, OR
HemCon Medical Technologies, Inc.
503-245-0459
10575 SW Cascade Ave
Portland, OR
Airefco, Inc.
503-692-3210
P.O. Box 1349
Portland, OR
Star Industrial Supply Inc
(503) 255-9249
3257 NW 29th Ave
Portland, OR

provided by: EDN

Engineers often face difficult trade-offs when voltage regulators can encounter high-voltage transients that are well above normal input-supply operating ranges. This situation is common in automotive applications in which high-voltage transients from an alternator load dump can produce transients of 36 to 75V for durations as long as 400 msec. Designers must choose between a regulator that can withstand such maximum input voltage or use an input-protection scheme. The simple circuit in this Design Idea provides a highly cost-effective method for clamping an input voltage from a battery input with transients as high as 50V to take advantage of a 20V, 3-MHz regulator. With this circuit, your design can achieve a small total footprint with relatively low cost because of the 3-MHz operation along with lower voltage components than might otherwise be necessary to withstand 50V.

Input-protection components consist of Q1, R1, D1, C5, and one-half of D2 (Figure 1). At start-up, N-channel MOSFET Q1?s source is at ground potential and turns on when R1 applies the battery voltage to the gate. Once the input voltage is above the minimum of 2.74V on IC1, the LM2734Z regulator starts switching, which charges the bootstrap circuit comprising D3, D4, and CB. This bootstrap voltage of approximately VOUT?VFD (forward-voltage drop) of D3 then transfers to the gate source of Q1. Capacitor C5 then maintains gate drive during the bootstrap diode?s off times.

Under normal operating conditions, for example, the battery voltage is 8 to 18V, D1 does not limit conduction of Q1, and the gate voltage tracks approximately 2.5V above the input-supply voltage for a low voltage drop from the battery voltage to the input voltage of the LM2734Z. However, when the input voltage increases above the threshold that D1 sets, the input voltage to the LM2734Z regulates to the zener voltage (VZ) of D1 minus the threshold voltage of Q1, or approximately 20?2V=18V, well below the 24V absolute maximum of the LM2734Z. Selecting Q1 requires careful consideration of maximum input voltage, gate-to-source-voltage threshold, and power dissipation under both steady-state and thermal-transient conditions.

Q1, the SI1470DN N-channel MOSFET, provides 50V protection with a drain-to-source voltage (VDS) of 30V+20V (zener diode D1 voltage), has an on-resistance of 95 m? at a gate-to-source voltage of 2.5V, and comes in a thermally efficient SC70-6 package. For some applications, the regulator?s output voltage may be insufficient to fully turn on the selected protection MOSFET, so you can increase the bootstrap voltage with a separate zener reference, as the LM2734Z?s data sheet shows (Reference 1).


References:

Reference

  1. ?LM2734Z Thin SOT23 1A Load Step-Down DC-DC Regulator,? National Semiconductor, www.national.com/pf/LM/LM2734Z.html.



author: Kevin Daugherty, National Semiconductor, Novi, MI

EDN. Copyright © 2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.

Featured Local Company

National Builders Hardware Co.

(503)233-5381
P.O. Box 14609
Portland, OR

Related Local Events
Port Of Longview Final Budget Hearing
Dates: 12/1/2009 - 12/1/2009
Location: Cowlitz Regional Conference Center
Longview, WA
View Details

Washington State Financing Commission Homebuyer Education Seminar
Dates: 12/16/2009 - 12/16/2009
Location: Park Tower II
Vancouver, WA
View Details

WOOD TECHNOLOGY CLINIC & SHOW
Dates: 3/9/2010 - 3/12/2010
Location: Oregon Convention Center
Portland, OR
View Details

Washington State Financing Commission Homebuyer Education Seminar
Dates: 11/21/2009 - 11/21/2009
Location: Community Housing Resource Center
Vancouver, WA
View Details

Washington State Financing Commission Homebuyer Education Seminar
Dates: 11/17/2009 - 11/17/2009
Location: Park Tower II
Vancouver, WA
View Details