Power Integrity Engineering San Jose CA

The following contains construction services information you should know about power integrity engineering. Read on if you or a loved one is interested in hiring or performing construction services or projects in San Jose.

Local Companies

Renewable Power Solutions Inc
408-998-7400
2029 O' Toole Ave
San Jose, CA
Lee Incorporated
(408) 885-9300
25 N 14th St Ste 880
San Jose, CA
Ch2M Hill
(408) 436-4936
1737 N 1st St
San Jose, CA
J D Systems Design Engineering
(408) 263-8566
San Jose, CA
Schneider Engineering
(408) 275-6482
503 Raymond Ave
San Jose, CA
Egron Assoc
(408) 629-4088
303 Fontanelle Dr
San Jose, CA
Whipsaw Inc
(408) 297-9771
434 S 1st St
San Jose, CA
Shaktee Technologies
(408) 371-8270
1975 Hamilton Ave
San Jose, CA
Teklicon Inc
(408) 261-8800
3031 Tisch Way Ste 1010
San Jose, CA
It Ecorporation
(408) 938-1000
31 N 2nd St
San Jose, CA

provided by: EDN

THE CHALLENGE

As servers, routers and switching equipment shrink, managing the demand for more power in smaller packages is becoming an even bigger challenge for OEMs. Unlike signal connectors, which continue to get smaller at higher transmission speeds, power connectors require a specific amount of conductive material to carry specific amounts of current or amperage. While progress is being made in perfecting low resistance interfaces, as power needs increase, so does the amount of space needed for higher power interconnects.

Power Integrity engineering can help solve these challenges. With broad experience in power integrity engineering, connector manufacturers are well qualified to solve many of the problems common to these complex designs, including system safety, reliability and air flow.

THE SOLUTION

Power Integrity Engineering Factors

Even though designs often require more power to travel across a limited amount of space, several factors still affect the density of a design and how much power it can actually handle. Variables include the amount of space that is actually available (height, width and length), the thickness and number of copper layers in the printed circuit board; and how the airflow amount; and flow pattern influence the interconnect temperature rise. Understanding each of these elements very early in the design phase is necessary to successfully design power integrity into the system and speed the design process.

Space

While saving space and costs are top priorities for OEMs, it is crucial to determine how much space is required for a power interconnect versus how much has been allotted. The available height and length for the connector directly affects achievable current density. For instance, an OEM might specify there is 3.5 inches on a card edge to place a power connector and needs to deliver 600 amps though this distance. While a lower profile power connector may be preferable for maximizing airflow, a taller connector may be required to handle the amount of current.

PCB Construction

The number of layers, the thickness of layers (often referred to as number of ounces, e.g., a one ounce copper layer is roughly .0015 inch thick), copper and trace widths all impact current density. Designing trace sizes can be compared to choosing the appropriate wire gauge in a power harness. When considering the entire power architecture, understanding constriction points end-to-end is a key factor for understanding resistance and voltage drops, as well as for managing temperature rise.

Contact Design

Bulk resistance and contact resistance are the two critical factors in a power interconnect. Bulk resistance refers to the amount of contact material and its resistive properties. Contact resistance is that resistance between the mating contacts at the point of interface. When designing power receptacle contacts, design engineers must understand the relationship between the material conductivity and spring force characteristics. The higher percentage of copper in an alloy (for example, standard phosphor bronze is 47 percent) the more conductive it is. The trade off with higher percentage copper content is in long term stress relaxation and the resulting loss in normal force and increased contact resistance.

Ensuring adequate normal force over time is the primary goal when designing a power contact. The contact design must provide multiple points of contact for redundancy as well as appropriate plating. Because contact fretting and corrosion must be avoided at all costs, gold and silver are preferred for contacts used in high power interconnects.

More companies are using press-fit or compliant-pin technology to assemble components to printed circuit boards. This provides another challenge because, generally, engineers will not accept more than six amps per board hole or via. The thin copper plating of via walls can become a weak point over time. Therefore, designing an interconnect with more current-carrying capability to the PCB requires more space. For example, a 150 amp power module needs at least 25 individual compliant pins to adequately distribute the current from the interconnect to the PCB to meet the six amp maximum requirement.

Airflow and Thermal Requirements

Thermal issues, often influenced by the system airflow, are another important element that must be considered early in the design process. Directing airflow is critical as systems are packaged into smaller boxes with more components. Since power connectors are at the connection point (like between a power supply and server) they are often in the path of air and can block the flow. Minimizing the connector height is crucial in blade servers where low profile blades are attractive to businesses trying to maximize computing power in the smallest amount of space. Airflow around a connector also helps cool the power contact, lowering the temperature rise and allowing for more current or a bigger safety margin.

Rating Connector Performance

Power connectors are typically rated at performance levels with a 30° temperature rise benchmark. However, there are caveats to this rating method. First, how and where thermocouples are attached to the interconnect can have profound influence on measuring temperatures. The hottest spot in a well-designed interconnect is at the point of contact between the two connecting contacts, often called the plug side contact and the receptacle side contact, or just the plug and receptacle. Placing a thermocouple in close proximity to this point can be challenging.

Understanding contact stability over time is as important as understanding the T-rise. Some system architects are comfortable using a connector at currents that generate over a 30° T-rise as long as the contact interface is proven to be stable over time. Measuring contact resistance often expressed in milliohms or voltage drop, is one way to do this. The change in resistance or DR can be used to predict interconnect performance. An excellent explanation of how to do this is available in a paper titled "Voltage Drop Stability as a Method of Rating Power Contacts", by Dr. Robert Malucci and Frank Ruffino.

THE CONCLUSION

Tools for Power Integrity Engineering

Connector manufacturers can provide analyses and tests to help support design engineers' efforts to provide the required power (current) at manageable temperatures. Thermal models correlated with actual testing can identify hot spots that require additional airflow. Voltage drop information can often be a critical factor, so providing resistance measurements is a useful tool. Providing a reliable prediction on the interconnect's current-carrying capability is also very important. The system designer must know precisely what the connector can handle. This is a major responsibility because the designer must ensure the system runs at all times without compromising safety.



author: By Billy Ken Stead, Product Development Manager, Molex Incorporated

EDN. Copyright © 2007 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.

Featured Local Company

Renewable Power Solutions Inc

Solar and wind power design, Engineering, acquisition and installations

408-998-7400
2029 O' Toole Ave
San Jose, CA
www.rps-solar.com

Renewable Power Solutions, Inc.is based in San Jose CA, we provide the best solar electric solution for the future.

Experience.

We have 10+ years of experience in the alternative energy industry using current technologies and state of the art techniques to ensure the best possible solar electric system to meet the needs of our customers.

Our Commitment to You

Power Solutions' commitment to the public is to design and install the solar electric system that best suits your family or business needs. By using our 10 years of experience in the alternative energy industry, current technologies and state of the art techniques we will ensure the best possible solar electric system for you.

Our Principals

We only represent manufacturers that have proven to have excellent customer service, the most reliable products and the least environmental impact during manufacturing. Our 100% customer satisfaction rating is our most important certification. We will not sacrifice it by representing manufacturers that do not share our high standards for sustainability and customer satisfaction.

Our Solution

We would like for everyone to be energy independent and that includes you. Our solution will be presented to you in simple fashion; our engineering team is not allowed to do proposals. We warranty the simplicity of our proposal to make sense environmentally and economically. Your next door neighbors solutions is not necessary the right solution for you. We provide you with one on one attention from the initial visit to the last one.



Related Local Events
DesignCon
Dates: 2/1/2010 - 2/4/2010
Location: Santa Clara Convention Center, Santa Clara
Santa Clara, CA
View Details

AAMA - American Architectural Manufacturers Association Western Region Spring Meeting 2010
Dates: 5/5/2010 - 5/6/2010
Location: Waterfront Plaza
Oakland, CA
View Details

Pacific Coast Industrial & Machine Tool Show
Dates: 11/10/2009 - 11/12/2009
Location: Santa Clara Convention Center
Santa Clara, CA
View Details

Northern California Facilities Expo (NCPE)
Dates: 9/30/2009 - 10/1/2009
Location: Santa Clara Convention Center
Santa Clara, CA
View Details

Photovoltaic System Design for Engineers and Designers
Dates: 9/14/2009 - 9/14/2009
Location: Fort Mason Center-Herbst Pavillion
San Francisco, CA
View Details